Yodogawa trailhead - Yodogawa hut - Hananoego - Miyanoura-dake (out and back) normal route
Hiking
Technical 2/7
Effort 4/7 · Hard
Length 9–10 h
Altitude Low
Physical 4, difficulty D (Yakushima Ministry of Environment route levels (physical 1-5, difficulty A-D))
- Start
- Yodogawa trail entrance (Yodogawa Tozanguchi)
- Total gain
- 567 m
- Length
- 13 km
- Duration
- 9–10 h
- Summit day
- 567 m up · 9–10 h
Rough, rooty and rocky granite trail with wooden steps and some stream crossings, non-technical; long day and frequent heavy rain/fog make it serious. Environment Ministry says it needs equipment and judgement (experienced hikers).
Gear: full rain gear, warm layers (subalpine summit), headlamp (early start), portable toilet bag (collection boxes at trailhead)
Permits: No permit; climbing registration form at trailhead; Yakushima mountain environment conservation donation requested.
Learn more: hikesinjapan.yamakei-online.com · env.go.jp
Traverse: Yodogawa trailhead - Miyanoura-dake - Shin-Takatsuka hut - Jomon-sugi - Arakawa trailhead
Trekking
Technical 2/7
Effort 3/7 · Demanding est.
2–3 days on the mountain
Altitude Low
Physical 5, difficulty D (Yakushima Ministry of Environment route levels (physical 1-5, difficulty A-D))
- Start
- Yodogawa trail entrance (exit Arakawa trail entrance)
- Total gain
- 800 m Estimate
- Length
- 21 km
- Duration
- 2–3 days
- Nights
- 1
- Last night at
- Yodogawa hut (if starting the evening before)
- Summit day
- 600 m up · 6.5–9.5 h Estimate
Non-technical; long descent past Jomon-sugi and along old logging railway (gaps in track bridges). Usually one night in the free, unmanned Shin-Takatsuka hut (or Yodogawa hut before).
Technical: stream crossings, old logging-railway bridges
Gear: sleeping bag and stove (huts unmanned), rain gear, portable toilet bag
Permits: No permit; huts free, first come first served.
Learn more: env.go.jp · hikinginjapan.com
Yodogawa trailhead - Miyanoura-dake - Nagata-dake - Nagata trailhead
Trekking
Technical 3/7
Effort 4/7 · Hard est.
2 days on the mountain
Altitude Low
Physical 5, difficulty D (Yakushima Ministry of Environment route levels (physical 1-5, difficulty A-D))
- Start
- Yodogawa trail entrance (exit Nagata trail entrance)
- Total gain
- 750 m Estimate
- Length
- 19 km
- Duration
- 2 days
- Nights
- 1
- Last night at
- Yodogawa hut
- Summit day
- 9–13 h Estimate
Many unmaintained sections, dangerous stream crossings when water is high and real risk of getting lost; overnight assumed.
Technical: river crossings, unmaintained trail
Gear: overnight gear, navigation
Learn more: env.go.jp
Kuromi Dake : Par le sentier de la Cabanne de Yodogawa
Technical –/7
Effort 2/7 · Moderate est.
Altitude Low
- Total gain
- 631 m
- Length
- 10 km
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.