Bessan ridge (Bessan o'ne) from Murodo via Kenzan-so and Mae-tsurugi normal route
Climbing
Technical 3/7
Effort 3/7 · Demanding est.
2–3 days on the mountain
Altitude Moderate
technical level E, stamina 4; Yamakei skill 5/5 (Japan Alps Association technical level (A-E) / Yamakei rating)
- Start
- Murodo (Tateyama Kurobe Alpine Route) · 2,420 m
- Total gain
- 1,266 m
- Length
- 15.6 km
- Duration
- 2–3 days
- Nights
- 1
- Summit day
- 529 m up · 5–8.5 h upper end estimated
Class 3 scrambling on steep, exposed granite with fixed chains (Kani no Tatebai ~20 m vertical chain section on ascent, Kani no Yokobai traverse on descent).
Technical: fixed chains, exposed class 3 scrambling, rockfall zone between Ippuku-tsurugi and summit
Gear: helmet (strongly recommended), harness, slings and carabiners to clip chains (recommended), hiking boots
Permits: No permit; hut reservations advised. Access via the seasonal Tateyama Kurobe Alpine Route.
Learn more: thejapanalps.com · hikesinjapan.yamakei-online.com · thejapanalps.com
Hayatsuki ridge (Hayatsuki o'ne) from Banba-jima
Climbing
Technical 3/7
Effort 4/7 · Hard est.
2–3 days on the mountain
Altitude Moderate
- Total gain
- 2,250 m
- Length
- 16.2 km
- Duration
- 2–3 days
- Nights
- 1
- Last night at
- Hayatsuki-goya · 2,200 m
- Summit day
- 799 m up · 5–8.5 h Estimate
One of the 'three great climbs' of the Japan Alps for its ~2,250 m of gain; elevation and times from search snippets of the Japan Alps Association pages (estimate).
Technical: fixed chains and ladders near the top, long sustained climb
Learn more: thejapanalps.com · thejapanalps.com