Ropeway top station - Senbon-hinoki hut - Hachitsumine traverse - Nyudo-dake, returning by the Hachitsumine bypass normal route
Climbing
Technical 4/7
Effort 3/7 · Demanding
Length 8–8.5 h
Altitude Low
technical 3/5, physical 3/5 (YAMA HACK ratings (1-5))
- Start
- Hakkaisan Ropeway top station (Yohaido refuge) (route low point 1,151 m) · 1,151 m
- Total gain
- 1,482 m
- Length
- 9.3 km
- Duration
- 8–8.5 h
- Summit day
- 1,482 m up · 8–8.5 h
Many fixed chain sections taken one person at a time, a near-vertical rock step with ladder and chains before Dainichi-dake and knife-edge ridges with drop-offs; the bypass is narrow with overgrown valley-side edges and still has some ladders and chains. Hikers often stop at Senbon-hinoki hut (4h45 round trip, 837 m ascent, also with chains near Yakushi-dake).
Technical: fixed chains, ladders, exposed knife-edge rock ridge, near-vertical rock step (Dainichi-dake)
Gear: hiking boots, gloves, helmet, chain spikes in early June (lingering snow)
Permits: Ropeway fare.
Learn more: yamahack.com
Byobu-michi up / Shinkai-michi down from the 2nd-station trailhead (1 night at Senbon-hinoki hut)
Climbing
Technical 4/7
Effort 5/7 · Very hard est.
2 days on the mountain
Altitude Low
4D (Niigata prefecture trail grading)
- Start
- 2nd-station trailhead (Ni-gome) · 460 m
- Total gain
- 1,899 m
- Length
- 9 km
- Duration
- 2 days
- Nights
- 1
- Last night at
- Senbon-hinoki hut
- Summit day
- 4.5–7 h Estimate
About 35 chain sections, an unchained narrow ridge below the 7th station, stream crossings, snow patches in Namagane-zawa into July and route-finding near Ryogan-no-sawa; a dotted (unmaintained) route.
Technical: ~35 fixed chain sections, snowfield crossing, stream crossings, route-finding
Gear: hiking boots, gloves, helmet, light crampons for snow patches
Learn more: yamahack.com