Dōsaka Tunnel (Dōsaka-suidō bus stop) - Iwashita-no-maru - Mishōtai-yama - Mishōtai-iriguchi (traverse) normal route
Hiking
Technical 2/7
Effort 3/7 · Demanding
1 day on the mountain
Altitude Low
T2 (SAC hiking scale)
- Start
- Dōsaka-suidō bus stop (Dōsaka Tunnel)
- Total gain
- 951 m
- Length
- 14 km
- Duration
- 1 day
Culmina: beginner, stamina 3/10, technical A (well-maintained trail); guidebook figures.
Gear: hiking boots, rain gear
Permits: No permit. Weekend/holiday Fujikyu bus from Tsurushi station (April-early December, not August) is too sparse for a same-day bus round trip; use a taxi or stay nearby.
Learn more: en.culmina.jp · Wikipedia (ja)
Ikenotaira (Shikadome forest road) - Munatsuki-hatchō - summit
Hiking
Technical 2/7
1 day on the mountain
Altitude Low
T2 (SAC hiking scale)
- Start
- Ikenotaira trailhead (about 8 km from Higashi-Katsura station)
- Duration
- 1 day
Steep climb through cedar plantation, especially at Munatsuki-hatchō; trail eroded and possibly blocked by fallen trees (Tsuru city).
Gear: hiking boots, rain gear
Permits: Shikadome forest road is gravel, narrow, closed in winter and closed to vehicles of 11+ seats.
Learn more: city.tsuru.yamanashi.jp · Wikipedia (ja)
Hosono Miwa-jinja route
Hiking
Technical 2/7
1 day on the mountain
Altitude Low
T2 (SAC hiking scale)
- Start
- Hosono (Hotokegasawa) parking space, 3-4 cars
- Duration
- 1 day
Stream walk then a very steep climb to the ridge; red clay slippery after rain. Bridge onto the trail broken; access road has construction traffic (Tsuru city).
Gear: hiking boots, rain gear
Learn more: city.tsuru.yamanashi.jp