Hotaka-jinja (Urami-no-taki) loop via Tekoyazawa emergency hut, Oki-Hotaka summit and Kengamine normal route
Hiking
Technical 3/7
Effort 3/7 · Demanding
Length 6.5–8 h
Altitude Low
T3-T4 (short kusari chain sections) (SAC hiking scale)
- Start
- Urami-no-taki car park / Hotaka-jinja (end of forest road) · 1,000 m
- Total gain
- 1,260 m
- Length
- 9 km
- Duration
- 6.5–8 h
- Summit day
- 1,260 m up · 6.5–8 h
Steep rocky climb above the hut with about five fixed-chain sections (the last about 20 m), loose talus below the summit and a steep, eroded descent off Kengamine. Hikinginjapan and Ridgeline Images both rate it 4/5; Culmina says technical B-C.
Technical: fixed chains (kusari-ba), loose talus, steep eroded descent
Gear: hiking boots, gloves for chains, map/GPS, bear bell
Learn more: en.culmina.jp · ridgelineimages.com · hikinginjapan.com
Kawaba Ski Resort lifts - Kengamine - Hotakayama (winter/spring)
Climbing
Technical 4/7
Effort 1/7 · Easy est.
Altitude Low
- Start
- Kawaba Ski Resort (top of lifts)
- Total gain
- 450 m Estimate
- Length
- 6.5 km Estimate
Snow-season route (about mid-December to April) from the top of the ski lifts; backcountry winter conditions, for experienced winter climbers only.
Technical: snow and ice ridge
Gear: crampons, ice axe, snowshoes, avalanche gear
Learn more: en.culmina.jp