- Start
- Ogimachi village, Shirakawa-go (beside Myōzen-ji)
- Duration
- 9.7 h
- Summit day
- 9.7 h
The only route starts beside Myōzen-ji temple in Ogimachi village and follows the Miyadani valley and a long ridge over Kaerikumo-yama; the path near the summit is indistinct, so it is usually done on lingering spring snow, which needs route-finding. One party's round trip took about 9 h 40 min including breaks (from search snippet).
Technical: indistinct path near the summit, snow slopes in spring
Gear: crampons or snowshoes (spring snow), skis (optional)
Learn more: Wikipedia (ja) · yamakei-online.com
