Oidaira route (Yamanashi side) normal route
Trekking
Technical 3/7
2 days on the mountain
Altitude Moderate
Physical 7/10, technical D (Yamanashi/Shizuoka mountain grading)
- Start
- Oidaira trailhead (near Amahata Lake)
- Duration
- 2 days
- Nights
- 1
- Last night at
- camp on the route
Grade D: needs map reading, balance on rocky and snowfield sections, and route-finding. About 9 h 10 min from the trailhead to the summit (ascent only).
Gear: tent and camping gear, map and compass
Permits: No permit; no hut on the route.
Learn more: Wikipedia (ja) · yamakei-online.com
From Sawarajima (Shizuoka side)
Trekking
Technical 3/7
2 days on the mountain
Altitude Moderate
Physical 6/10, technical D (Yamanashi/Shizuoka mountain grading)
- Start
- Sawarajima
- Duration
- 2 days
- Nights
- 1
- Last night at
- Sawarajima Lodge
About 5 h 50 min from Sawarajima to the summit (ascent only); Yamakei's model round trip from here is 10 h 5 min over 2 days.
Learn more: Wikipedia (ja) · yamakei-online.com
From Nikenkoya via Dentsuke Pass
Trekking
Technical –/7
Altitude Moderate
Physical 6/10, technical D (Yamanashi/Shizuoka mountain grading)
- Start
- Nikenkoya
- Last night at
- Nikenkoya Lodge
About 7 h 5 min to the summit (ascent only).
Learn more: Wikipedia (ja)