Kurosawa (Iimori Kogen) route from Ontake Ropeway normal route
Hiking
Technical 2/7
Effort 3/7 · Demanding
1–2 days on the mountain
Altitude Moderate
Technical B, physical 2 (Japan Alps technical level (A-E) / physical level)
- Start
- Iimori Kogen station (top of Ontake Ropeway) · 2,150 m
- Total gain
- 917 m
- Length
- 7.8 km
- Duration
- 1–2 days
- Summit day
- 917 m up · 5.5–6.5 h
Rocky volcanic trail, steep above Kuroiwa; no scrambling beyond hands-for-balance. Helmets are advised because of the volcano.
Gear: helmet (strongly advised; rentable), hiking boots, 2 L water (water only at huts), rain/wind gear
Permits: No permit, but summit-area access around Kengamine has been restricted since the 2014 eruption and is opened only during a seasonal restriction-relaxation period; check current volcanic alert and Kiso town notices. Climbing notification (tozan todoke) expected.
Learn more: thejapanalps.com · soranews24.com
Otaki route from Tanohara
Hiking
Technical 2/7
Effort 2/7 · Moderate
1 day on the mountain
Altitude Moderate
- Start
- Tanohara
- Total gain
- 900 m Estimate
- Length
- 5.7 km
- Duration
- 1 day
- Summit day
- 4.5–5.5 h
Traditional pilgrimage path to Otaki summit and on to Kengamine; no huts or toilets for the first ~2 hours.
Gear: helmet (rentable at Tanohara visitor center)
Permits: Ridge between Otaki summit and Kengamine has been opened only during a seasonal restriction-relaxation period (roughly July to mid-October); check current notices.
Learn more: soranews24.com