Kilembe route via Bugata, Hunwick's and Margherita Camp (Rwenzori Trekking Services) normal route
Expedition
Technical 4/7
Effort 5/7 · Very hard est.
8 days on the mountain
Acclimatization included
Altitude Very high
- Total gain
- 4,300 m Estimate
- Length
- 60 km Estimate
- Duration
- 8 days
- Nights
- 5
- Summit day
- 624 m up · 8–13 h Estimate
Summit day is roped glacier travel on the Stanley and Margherita glaciers, with a section of about 200 m of steep ice, then a short rocky finish. Fixed and temporary ropes; beginners are taught on the way. Less experienced climbers can stop at an outcrop on Alexandra Peak.
Technical: roped glacier travel (Stanley and Margherita glaciers), steep ice section of about 200 m, fixed ropes and ladders, rocky summit block
Gear: crampons, ice axe, harness and carabiners (supplied), ascender and figure-8, warm sleeping bag, rain gear and boots for deep mud
Permits: Uganda Wildlife Authority park entry (about USD 35 per night); climbs run with a licensed operator and guide. Package about USD 1,695 per person (2020s operator price).
Learn more: rwenzoritrekking.com · en.wikivoyage.org
Central Circuit from Nyakalengija via Elena Hut (Rwenzori Mountaineering Services)
Expedition
Technical 4/7
Effort 7/7 · Extreme est.
7 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
- Start
- Nyakalengija
- Total gain
- 3,900 m Estimate
- Length
- 56 km Estimate
- Duration
- 7 days
- Summit day
- 8–13 h Estimate
The classic Central Circuit operated from Nyakalengija on the Mubuku side, advertised as the shortest and easiest route to the summit but with less time to acclimatise. Summit day includes glacier crossings with crampons, ice axe and harness.
Technical: roped glacier travel, fixed ropes
Gear: crampons, ice axe, harness
Permits: Uganda Wildlife Authority park fee (about USD 34 per day); expect at least USD 1,500 for a 7-day trip.
Learn more: en.wikivoyage.org
Olhukuka Route (rock alternative to the upper glacier)
Climbing
Technical 6/7
Effort 3/7 · Demanding est.
⚠ Prior acclimatization required · ~0 days
Altitude Very high
D, 4c (French)
- Total gain
- 650 m Estimate
- Length
- 5.5 km Estimate
Four-pitch, 130 m rock route starting at about 4,800 m from the left edge of the Margherita glacier (pitches 3, 3+, 4c, 3+); opened as an alternative when a crevasse closed the normal glacier finish in 2024.
Technical: 4-pitch rock climb up to 4c, bolted belays
Gear: friends and nuts, rope, crampons for the glacier approach
Learn more: Camptocamp
Ngaliema / Mont Stanley (Ruwenzori) - Pic Marguerite : Depuis Kilembe
Technical 4/7
Effort 4/7 · Hard est.
8 days on the mountain
Acclimatization included
Altitude Very high
PD (IFAS (French alpine))
- Total gain
- 6,300 m
- Length
- 86 km
- Duration
- 8 days
Gear: glacier gear (rope, harness, crampons, ice axe)
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Ngaliema / Mont Stanley (Ruwenzori) - Pic Marguerite : Vallée de Bujuku > Vallée de Mujuku
Technical 4/7
Effort 3/7 · Demanding est.
8 days on the mountain
Acclimatization included
Altitude Very high
PD (IFAS (French alpine))
- Total gain
- 3,500 m
- Duration
- 8 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.