Narada – Daimonzawa route (out and back) normal route
Trekking
Technical 2/7
Effort 4/7 · Hard
2 days on the mountain
Altitude Moderate
Also called: Daimonzawa route
- Start
- Narada Onsen car park (Hayakawa town, Yamanashi) · 841 m
- Total gain
- 2,185 m
- Duration
- 2 days
- Nights
- 1
- Last night at
- Daimonzawa Hut (Daimonzawa-goya) · 1,765 m
- Summit day
- 1,261 m up · 8.5 h
Steep, rocky trail with a long boulder-field section, ladders and chains and repeated log-bridge stream crossings; no climbing. Very large height gain from Narada (about 840 m) to over 3,000 m.
Technical: ladders and chains, steep boulder field, log-bridge stream crossings
Gear: hiking boots, rain gear
Permits: No permit; Daimonzawa Hut open early July to mid-October (meals or tent pitch paid at the hut).
Learn more: yamahack.com · Wikipedia (ja)
Shiomi-dake – Notori-dake traverse (Hakuho ridge)
Trekking
Technical 2/7
Effort 4/7 · Hard
4 days on the mountain
Altitude Moderate
- Start
- Torikura (Toyoguchi) trailhead
- Duration
- 4 days
- Nights
- 3
- Last night at
- Notori Hut (Notori-goya) · 2,800 m
- Summit day
- 226 m up · 8.5 h
Long ridge traverse with rocky sections (Tengu-iwa near Shiomi-dake), a large collapse area near Igawa-goe and old log bridges and ladders near Sanpuku Pass; ends with the Daimonzawa descent to Narada.
Technical: rocky ridge sections, ladders
Gear: hiking boots, rain gear
Permits: No permit; huts require reservations and open only in summer (early July to late Sept/mid-Oct depending on hut). Private cars cannot reach Torikura; seasonal bus.
Learn more: yamahack.com