Togenochaya - Minenochaya-ato - Asahi-dake - Shimizudaira - Sanbonyari-dake (out and back) normal route
Hiking
Technical 2/7
Effort 2/7 · Moderate
Length 4.9 h
Altitude Low
- Start
- Togenochaya prefectural car park · 1,462 m
- Total gain
- 700 m Estimate
- Length
- 10.5 km Estimate
- Duration
- 4.9 h
Physically modest, but includes narrow rocky traverses with drop-offs on the Asahi-dake section and long stretches on an exposed, windy ridge.
Technical: narrow rocky traverse (Asahi-dake), exposed windy ridge
Gear: hiking boots, windproof layers
Learn more: yamakei-online.com
Togenochaya - Chausu-dake - Nasu Ropeway summit station
Hiking
Technical 1/7
Effort 1/7 · Easy
Length 2.2 h
Altitude Low
easy (YAMAP difficulty)
- Start
- Togenochaya prefectural car park · 1,462 m
- Total gain
- 444 m
- Length
- 3.4 km
- Duration
- 2.2 h
Short climb to the active main cone Chausu-dake (1,915 m); the ropeway allows an even shorter ascent from the summit station.
Gear: hiking boots
Learn more: yamap.com