Oyama Cable bus stop - Afuri Shrine (Shimosha) - summit (Honsha), round trip on foot normal route
Hiking
Technical 2/7
Effort 2/7 · Moderate
Length 5–5.2 h
Altitude Low
beginner, stamina 3/10, technical B (Japanese guide ratings (Culmina))
- Start
- Oyama Cable bus stop (bus from Isehara station, 25 min)
- Total gain
- 938 m
- Length
- 6.9 km
- Duration
- 5–5.2 h
- Summit day
- 938 m up · 5–5.2 h
Long stone staircases and steep, rocky/rooty trail above the lower shrine; no scrambling.
Gear: hiking shoes, rain gear
Learn more: en.culmina.jp
Ōyama cable car to Afuri Shrine station - summit (round trip)
Hiking
Technical 2/7
Effort 2/7 · Moderate
Length 2.9–3 h
Altitude Low
beginner, technical B (Japanese guide ratings (Culmina))
- Start
- Afuri Jinja cable car station
- Total gain
- 556 m
- Length
- 3.6 km
- Duration
- 2.9–3 h
- Summit day
- 556 m up · 2.9–3 h
Cable car removes the lower stairs; the remaining trail is steep but straightforward.
Gear: hiking shoes
Permits: No permit; cable car fare.
Learn more: en.culmina.jp
Yabitsu Pass - summit
Hiking
Technical 2/7
Effort 1/7 · Easy est.
Altitude Low
- Start
- Yabitsu Pass (bus from Hadano station, 48 min)
- Total gain
- 520 m Estimate
- Length
- 4.8 km Estimate
Shortest approach from the west; about 1 h 10 min to the summit, but return buses from the pass are very sparse on weekdays.
Gear: hiking shoes
Learn more: en.culmina.jp