- Start
- Seigakuso hut car park · 680 m
- Total gain
- 860 m
- Length
- 9.7 km
- Duration
- 1 day
- Summit day
- 860 m up · 4–6 h
About 12-15 stream crossings, small waterfalls with ropes/chains and mild scrambling; slippery when wet or icy.
Technical: stream crossings, short roped waterfall steps
Gear: shoes suitable for wet rock, wind/rain layer, microspikes in cool months, bear bell
Permits: No permit. A trailhead sign bans starting after noon.
Learn more: hokkaidowilds.org · hikinginjapan.com · mountainsofhokkaido.com
