Megami-jaya route: Tateshinayama trailhead (Megami-jaya) - summit and back normal route
Hiking
Technical 2/7
Effort 2/7 · Moderate
Length 4.5–5 h
Altitude Moderate
B (Culmina technical grade (A-E))
- Start
- Tateshinayama Trailhead bus stop (Megami-jaya)
- Total gain
- 806 m
- Length
- 9 km
- Duration
- 4.5–5 h
- Summit day
- 806 m up · 4.5–5 h
Steady forest climb, then a boulder field on the summit cone where hands help; stamina 2/10. Roughly SAC T2-T3. Culmina gives 806 m in its data box and about 785 m in the text.
Gear: hiking boots, all water (no sources on the trail)
Learn more: en.culmina.jp
Nanagome (7th station) route via Shogun-daira and Tateshina Sanso
Hiking
Technical 2/7
Effort 2/7 · Moderate est.
Altitude Moderate
- Start
- Nanagome (7th station) trailhead
- Total gain
- 630 m Estimate
- Length
- 5 km Estimate
Shorter route through forest to Shogun-daira (Tateshina Sanso hut) then up the summit boulder slope.
Gear: hiking boots
Learn more: en.culmina.jp
Okawara Pass loop via Shogun-daira
Hiking
Technical 2/7
Effort 2/7 · Moderate
Length 4 h
Altitude Moderate
- Start
- Okawara Pass car park
- Total gain
- 520 m Estimate
- Length
- 7 km Estimate
- Duration
- 4 h
- Summit day
- 4 h
About 4 hours round trip from the Okawara Pass car park on the Tateshina Skyline (summer road).
Gear: hiking boots
Learn more: en.culmina.jp