Tsubame Onsen - Asadaira - Tengudo - summit (out and back) normal route
Hiking
Technical 3/7
Effort 3/7 · Demanding
Length 6.5–8 h
Altitude Low
B (culmina technical grade (A-E))
- Start
- Tsubame Onsen · 1,150 m
- Total gain
- 1,304 m
- Length
- 11.5 km Estimate
- Duration
- 6.5–8 h
Steep Munatsuki-hatcho pitch and a chain-assisted rocky section at Tengudo just below the summit (the crux; turn back in rain).
Technical: chains at Tengudo, steep loose steps
Gear: hiking boots, gloves for chains, bear bell/spray
Learn more: en.culmina.jp · kantoadventures.com
Akakura Sky Cable top station - summit
Hiking
Technical 3/7
Effort 3/7 · Demanding
Length 8 h
Altitude Low
B (culmina technical grade (A-E))
- Start
- Akakura Sky Cable top station · 1,300 m
- Total gain
- 1,200 m Estimate
- Length
- 10 km Estimate
- Duration
- 8 h
Joins the Tengudo chain section.
Technical: chains at Tengudo
Gear: hiking boots
Learn more: en.culmina.jp
Sasagamine - Koyaike - (Mt. Hiuchi) - Myoko traverse
Trekking
Technical 2/7
Effort 4/7 · Hard est.
2 days on the mountain
Altitude Low
B (culmina technical grade (A-E))
- Start
- Sasagamine · 1,300 m
- Total gain
- 1,900 m Estimate
- Length
- 23 km Estimate
- Duration
- 2 days
- Nights
- 1
- Last night at
- Koyaike Hutte · 1,990 m
- Summit day
- 464 m up · 7–11 h Estimate
Long ridge traverse usually split over two days.
Gear: hiking boots
Permits: Koyaike Hutte requires booking
Learn more: en.culmina.jp