Track · hiking
Thulo Gumela to Namche Bazaar
Monday 17 April 2023, 07:59
9.6 km · +995 m / −225 m · moving 5h 42m · stopped 1h 22m · high point 3,461 m
Uphill · 5 parts
4h 50m
8.2 km · +954 m / −70 m
197 m/h climbing rate · 1.7 km/h
Heart rate 72–132 · avg 98
≈ 1,364 kcal est.
Training load ≈ 18 est. · TRIMP 163
aTRIMP 177 est. · hypoxic dose 14.7 km·h
Downhill · 3 parts
52 min
2.1 km · +37 m / −156 m
179 m/h descending rate · 2.4 km/h
Heart rate 73–115 · avg 89
≈ 215 kcal est.
Training load ≈ 2 est. · TRIMP 22
aTRIMP 24 est. · hypoxic dose 2.4 km·h
Standing · 2 parts
1h 22m
+6 m / −4 m
Heart rate 84–110 · avg 92
≈ 134 kcal est.
Training load ≈ 1 est. · TRIMP 6
aTRIMP 6 est. · hypoxic dose 0.6 km·h
Whole activity
7h 05m
10.4 km · +992 m / −221 m
07:59 → 15:04 local
high point 3,461 m
Heart rate 72–132 · avg 97
1,714 kcal (Garmin)
Training load 20 (Garmin) · TRIMP 191 · aerobic effect 1.2
aTRIMP 206 est. · hypoxic dose 17.6 km·h
Elevation by time
Elevation by distance
Heart rate, 1-minute averages, by your Garmin zones:
below zone 1
Zone 1 92–102Zone 2 103–124Zone 3 125–143Zone 4 144–161Zone 5 162+
Calories and load are Garmin's totals for the track, shared out like on climbs: calories by heart rate above resting (and time for the resting part), load by each part's Banister TRIMP.
Time in heart-rate zones
| below zone 1 | Zone 1 | Zone 2 | Zone 3 | Zone 4 | Zone 5 | |
|---|---|---|---|---|---|---|
| Uphill | 76 min 26% | 106 min 36% | 107 min 37% | 2 min 1% | – | – |
| Downhill | 32 min 61% | 10 min 20% | 10 min 19% | – | – | – |
| Standing | 4 min 31% | 6 min 55% | 2 min 14% | – | – | – |
| Whole track | 112 min | 122 min | 119 min | 2 min | – | – |
On the way
- night Namche Bazaar village · 3,440 m · 15:03
- along Dudh Koshi by the river · 09:02
- along Bhote Koshi by the river · 12:18
Parts of the day
| Part | Time | km | Up / down | Rate | HR avg | Height |
|---|---|---|---|---|---|---|
| Uphill | 07:59–08:18 19 min | 0.5 | +46 / −15 | 144 m/h | 87 | 2,691 → 2,722 m |
| Downhill | 08:18–08:28 10 min | 0.56 | +4 / −29 | 164 m/h | 80 | 2,722 → 2,697 m |
| Uphill | 08:28–08:41 12 min | 0.24 | +48 / −0 | 234 m/h | 100 | 2,697 → 2,747 m |
| Downhill | 08:41–09:03 22 min | 0.9 | +25 / −55 | 147 m/h | 97 | 2,747 → 2,716 m |
| Uphill | 09:03–10:04 1h 00m | 2.25 | +182 / −28 | 179 m/h | 100 | 2,716 → 2,872 m |
| Downhill | 10:04–10:23 19 min | 0.63 | +8 / −72 | 221 m/h | 85 | 2,872 → 2,808 m |
| Standing | 10:23–11:34 1h 11m | 92 | 2,807 m | |||
| Uphill | 11:35–13:22 1h 47m | 2.99 | +378 / −27 | 212 m/h | 99 | 2,802 → 3,155 m |
| Standing | 13:22–13:33 10 min | 95 | 3,155 m | |||
| Uphill | 13:33–15:04 1h 31m | 2.2 | +300 / −0 | 197 m/h | 98 | 3,161 → 3,461 m |
Uphill and downhill are cut where the climb really turns (wiggles under 40 m are ignored); a part that gains or loses under 1.5 % of its length (15 m per km) is rolling: up and down without much net height; standing is 5 minutes or more within 50 m and 15 m of height; faster than 12 km/h is a lift or vehicle.