Mount Gozen

1,405 m 4,610 ft

Mount Gozen
Hiking Technical 2/7 Effort 2/7 · Moderate Length 4.4–5.4 h Altitude Low

Mountain in Japan

Range: Eurasia › East Asia › Japanese Archipelago › Honshu › Kantō Mountains

Mount Gozen
Wikimedia Commons
Elevation
1,405 m 4,610 ft
source: Wikidata
Oxygen on the summit
≈ 84% of sea level · Close to normal
Type
Mountain
Country
Japan (JP)
Metropolis
Tokyo
Coordinates
35.7701, 139.0806

Why climb Mount Gozen?

One of the Okutama Three Mountains, reachable by train and bus from Tokyo, with a properly stiff climb above the blue of Lake Okutama. Come in late April for the carpets of dogtooth violets, or in autumn when the summit larches turn gold.

Normal route
Okutama-ko – Sasuzawa-yama – Sōgaku-san – Gozen-yama
4.4–5.4 h · 9.55 km
Best season
dogtooth violet (katakuri) flowering, late April to early May
autumn colour; larches turn the summit area gold

A steep but non-technical forest trail from Lake Okutama to the summit and back in a day.

Dangers and challenges

Technically easy, but the climb from Lake Okutama is steep and long for a 1,400 m hill, with loose gravel near the top. The summit is broad and wooded, so Lake Okutama is seen from the ridge on the way up.

  1. Low Exposure / falls Steep, slippery scree below Sasuzawa-yama and steep ground by Tochiyori Ōtaki on descent.
  2. Low Physical endurance Sustained steep climbing from the lake; about 3 hours up.
  3. Low Wildlife Monkeys seen near Tochiyori; a bear bell is advised.

Fun facts

Routes

Okutama-ko – Sasuzawa-yama – Sōgaku-san – Gozen-yama normal route Hiking Technical 2/7 Effort 2/7 · Moderate Length 4.4–5.4 h Altitude Low

Also called: Ōbuna ridge (大ブナ尾根)

Start
Okutama-ko bus stop / Ogōchi Dam car park
Length
9.55 km
Duration
4.4–5.4 h

Starts with a steep climb from the Ogōchi Dam up the Ōbuna ridge, then a long climb past Sasuzawa-yama and Sōgaku-san, with zig-zags on loose gravel just below the summit. YAMA HACK rates it 2/5 for fitness and technique. Out and back 4 h 25 min, 9.55 km, about 1,230 m cumulative ascent; Yamakei's traverse down to Sakaibashi via Tochiyori takes 5 h 25 min.

Gear: hiking boots, 2 litres of water or more

Learn more: yamahack.com · yamakei-online.com · Wikipedia (ja)

Sakaibashi – Tochiyori – Gozen-yama Hiking Technical 2/7 Altitude Low
Start
Sakaibashi bus stop (no parking)
Length
9.98 km

Up past Tochiyori and the Tochiyori Ōtaki falls; the falls section is steep. Also the usual descent of the Okutama-ko traverse (YAMA HACK course 2: 9.98 km, 4 h 30 min).

Learn more: yamahack.com

Tomin no Mori – Mitō-san – Gozen-yama traverse Hiking Technical 3/7 Effort 3/7 · Demanding Length 7.1 h Altitude Low
Start
Tokyo Tomin no Mori (Hinohara)
Length
19 km
Duration
7.1 h

Long traverse of the Okutama main ridge with ladders and chains; YAMA HACK course 4: 19 km, 7 h 05 min to Sakaibashi.

Technical: ladders, chains

Learn more: yamahack.com

Weather forecast

Loading forecast…

More forecasts: Japan Meteorological Agency · yr.no · meteoblue · Windy · Mountain-Forecast.com

Compare Mount Gozen with…

Suggestions: Ben Nevis similar hiking peak Mount Tai similar hiking peak Mount Pelée similar hiking peak Mount Kumotori nearest higher peak

Map and nearby peaks

PeakElevationDistance
Mount Ōdake1,266 m4.5 km
鍋割山 (東京都)1,084 m5.2 km
Mount Mutsuishi1,479 m6.1 km
Mount Mitake929 m6.4 km
Mount Mitō1,531 m7.0 km
笹ヶタワノ峰1,121 m7.5 km
Mount Makiyose1,188 m7.5 km
Mount Hinode902 m7.9 km
Maruyama1,098 m8.1 km
Mount Dohyo1,005 m8.5 km
Mount Takanosu1,737 m9.1 km
Mount Kawanori1,363 m9.2 km

On lists

Other names

Sources

AI-assisted research from the cited sources (November 2026, confidence: medium). Figures marked estimate are not official counts. Always check current conditions and local advice before you go.

  1. 御前山 (東京都) – Japanese Wikipedia
  2. 御前山 登山ガイド – YAMA HACK
  3. 御前山 – ヤマケイオンライン 山行記録

Data notes

Where sources disagree we show the value from our main data source and note the conflict. All data notes

Elsewhere