Mitakesan cable car station - Musashi-Mitake shrine (summit) - Rock Garden circuit normal route
Hiking
Technical 1/7
Effort 2/7 · Moderate
Length 3–3.5 h
Altitude Low
skill 1/5, fitness 1/5, gear 1/5 (Japanese guide ratings (Yamakei stars))
- Start
- Mitakesan station (top of Mitake Tozan Railway cable car from Takimoto, 407 m) · 831 m
- Total gain
- 91 m
- Length
- 7.8 km
- Duration
- 3–3.5 h
- Summit day
- 91 m up · 3–3.5 h
Paved approach through the shrine village, then forest trails; wet boulders in the Rock Garden can be slippery.
Gear: hiking shoes
Permits: No permit; cable car fare (about 600 yen one way).
Learn more: hikesinjapan.yamakei-online.com · en.japantravel.com
Okutama station - Nokogiriyama - Ōdake - Mitake - cable car down
Hiking
Technical 2/7
Effort 3/7 · Demanding est.
Length 9.8 h
Altitude Low
- Start
- JR Okutama station
- Total gain
- 1,440 m
- Length
- 11.6 km
- Duration
- –9.8 h
- Summit day
- 1,440 m up
Long ridge traverse over several Okutama peaks with steep sections and short chain-assisted rocky spots near Ōdake.
Gear: hiking boots, headlamp
Learn more: ahandsel.github.io