Northwest ridge (Seihoku-one) to Mount Kekachi normal route
Hiking
Technical 2/7
Effort 4/7 · Hard
Length 11.7 h
Altitude Low
- Start
- Northwest ridge trailhead
- Total gain
- 1,700 m
- Duration
- 11.7 h
Recently cleared ridge trail now shown as a regular trail on Shōbunsha's 2021 map; about 1,700 m of climbing with no hut on the way. Map course time 7 h up, 4 h 40 min down (11 h 40 min).
Gear: hiking shoes
Learn more: Wikipedia (ja)
Kekachi-dani snow gully (spring)
Climbing
Technical 3/7
Altitude Low
- Start
- Near Katakai Higashimata power station
Before the ridge trail, the only way was in the snow season: from near the Katakai Higashimata power station into Abeki-dani and up the Kekachi-dani snow gully.
Technical: snow gully
Gear: crampons, ice axe
Learn more: Wikipedia (ja)
Babajima via Ōneko-yama to Nekomata-yama
Hiking
Technical 3/7
Effort 5/7 · Very hard
Length 13.3 h
Altitude Low
- Duration
- 13.3 h
Up Bunakura valley, onto the ridge and over Ōneko-daira and Ōneko-yama; shown as a difficult (dashed) trail. Map course time 8 h up, 5 h 20 min down (13 h 20 min). There is no trail linking Nekomata, Kamatan and Kekachi.
Gear: hiking shoes
Learn more: Wikipedia (ja)