Ōgisawa – Harinoki Daisekkei – Harinoki Pass normal route
Climbing
Technical 3/7
Effort 4/7 · Hard
Length 9.7 h
Altitude Moderate
- Start
- Ōgisawa station (Kurobe Alpine Route) · 1,433 m
- Total gain
- 1,388 m
- Length
- 13.1 km
- Duration
- 9.7 h
- Summit day
- 9.7 h
Trail to Ōsawa hut, then up the lingering snow of the Harinoki Daisekkei (light crampons needed for much of the summer; rentable at Ōsawa hut) to Harinoki Pass and a rocky ridge to the summit. Steep near the 'nodo' narrows; Yamahack rates fitness 4/5 and technique 2/5.
Technical: summer snowfield (snow gorge) walking, rockfall on the snowfield
Gear: light crampons (4-6 point), hiking boots, rain and cold-weather gear, headlamp
Learn more: yamahack.com · Wikipedia (ja)
Narusawa-dake – Subari-dake – Harinoki-dake circuit from Ōgisawa
Climbing
Technical 3/7
2 days on the mountain
Altitude Moderate
7B (Shinshū mountain grading)
- Start
- Ōgisawa station · 1,433 m
- Length
- 22.97 km
- Duration
- 2 days
- Nights
- 1
Ridge circuit over the southern Ushiro-Tateyama peaks with ladders and chains; Nagano's mountain grading rates the circuit fitness 7, technical B. Yamahack gives about 15 h 45 min walking, 23 km, usually with one or more hut nights (e.g. Shinkoshi sansō).
Technical: ladders and chains, snowfield
Gear: light crampons, hiking boots
Learn more: pref.nagano.lg.jp · yamahack.com