Ōgisawa – Harinoki Daisekkei – Harinoki Pass normal route
Climbing
Technical 3/7
Effort 3/7 · Demanding
2 days on the mountain
Altitude Moderate
4B (Shinshū mountain grading)
- Start
- Ōgisawa station · 1,433 m
- Total gain
- 1,366 m
- Length
- 14.49 km
- Duration
- 2 days
- Nights
- 1
- Last night at
- Harinoki hut (Harinoki Pass) · 2,536 m
- Summit day
- 263 m up · 5 h
Same snow-gorge approach as Harinoki-dake to Harinoki Pass, then about 1 h on easy white gravel to the summit past the Nyakuichi-ōji shrine. Shinshū grading 4B; Yamahack rates fitness 4/5, technique 3/5.
Technical: summer snowfield (snow gorge) walking
Gear: light crampons (required on the snow gorge, rentable at Ōsawa hut), hiking boots, rain and cold-weather gear
Learn more: yamahack.com · Wikipedia (ja)
Funakubo Shindō from Nanakura (traverse)
Climbing
Technical 4/7
Effort 2/7 · Moderate est.
2 days on the mountain
Altitude Moderate
- Start
- Nanakura sansō · 1,060 m
- Length
- 16.78 km
- Duration
- 2 days
- Nights
- 1
- Last night at
- Funakubo hut · 2,459 m
- Summit day
- 340 m up
Long ridge from Nanakura sansō over Funakubo hut, Nanakura-dake and Kitakuzu-dake; the 'Renge no ōkudari' (about 500 m steep drop) has chains and ladders, and the narrow ridge needs route finding. Yamahack: 16.8 km, about 14 h 40 min over two days.
Technical: chains and ladders, narrow ridge
Gear: hiking boots, helmet
Learn more: yamahack.com · Wikipedia (ja)