- Start
- Momella Gate, Arusha National Park · 1,500 m
- Total gain
- 3,062 m
- Length
- 36 km
- Duration
- 3–4 days
- Nights
- 3
- Last night at
- Saddle Hut · 3,570 m
- Summit day
- 992 m up · 10–14 h
Mostly walking, but beyond Rhino Point the path drops over rocks with fixed chains as handrails, and the summit ridge runs along a crater rim with sheer cliffs on the inner side; loose scree on descent.
Technical: chain-assisted rocky section after Rhino Point, exposed crater-rim ridge
Gear: headlamp, warm layers and gloves for the night ascent, trekking poles
Permits: Arusha National Park fees and hut fees; an armed park ranger escort is mandatory, usually booked via a licensed operator (4-day climbs about US$850-1,500 per person including permits).
Learn more: tanzaniatourism.com · markhorrell.com · safaribookings.com
