Ogisawa - Kashiwabara Shindo - Jiigatake - Kashimayari normal route
Trekking
Technical 2/7
Effort 6/7 · Severe est.
2–3 days on the mountain
Altitude Moderate
Also called: Kashiwabara Shindo
- Start
- Kashiwabara Shindo trailhead (Ogisawa, Omachi)
- Total gain
- 2,888 m
- Length
- 23.2 km
- Duration
- 2–3 days
- Nights
- 1
- Last night at
- Hiyaike Sanso
Well-made hut trail from Ogisawa to Taneike Sanso, then over Jiigatake to Hiyaike Sanso and along the open ridge past Nunobiki-yama to the south summit. Yamakei's standard walking time for the round trip is 14 h 45 min (about 23 km, ~2,890 m up and down).
Gear: rain and wind gear
Permits: None; huts and tent sites open only in season.
Learn more: yamakei-online.com · Wikipedia (ja) · yamap.com · Wikipedia (ja)
Goryudake - Hachimine Kiretto - Kashimayari (Ushiro-Tateyama traverse)
Climbing
Technical 3/7
Altitude Moderate
- Start
- Hakuba Goryu ski area (Toomi ridge)
- Last night at
- Kiretto hut
Main-ridge traverse from Goryudake through the Hachimine Kiretto gap (2,518 m), the hardest section of the Ushiro-Tateyama trails, with chains and ladders on rock; one of Japan's 'three great kiretto'. Kiretto hut sits in the gap.
Technical: chains and ladders on exposed rock, narrow ridge
Gear: helmet
Permits: None.
Learn more: Wikipedia (ja)
Oyachihara - Akaiwa ridge
Climbing
Technical –/7
Altitude Moderate
- Start
- Oyachihara
Direct ridge from Oyachihara on the Shinshu side, mainly used in the snow season; no detailed description found.
Permits: None.
Learn more: Wikipedia (ja)