Machame Route normal route
Trekking
Technical 2/7
Effort 6/7 · Severe
6–7 days on the mountain
Acclimatization included
Altitude Very high
T3 (SAC hiking scale)
Also called: Whiskey route
- Total gain
- 4,255 m
- Length
- 62 km
- Duration
- 6–7 days
- Nights
- 6
- Summit day
- 1,222 m up · 12–16 h
Trail walking with steep scree and one hands-on section (the Barranco Wall); no technical gear. Wikipedia gives 49 km, an operator's daily distances add up to 62 km including the Mweka descent. Altitude is the real challenge.
Technical: Barranco Wall easy scramble, loose scree on summit night, possible snow/ice near the crater rim
Gear: trekking boots, warm layers and down jacket for summit night, trekking poles, headlamp, gaiters
Permits: Kilimanjaro National Park entry with daily conservation, camping and rescue fees; climbing only with a licensed guide through a registered operator. Descent via the Mweka route.
Learn more: followalice.com · Wikipedia
Marangu Route
1 member climbed it
Trekking
Technical 2/7
Effort 6/7 · Severe est.
5–6 days on the mountain
⚠ Prior acclimatization required · ~5 days
Altitude Very high
T2-T3 (SAC hiking scale)
Also called: Coca-Cola route
- Start
- Marangu Gate
- Total gain
- 4,100 m Estimate
- Length
- 64 km
- Duration
- 5–6 days
- Nights
- 4
- Summit day
- 1,165 m up · 10–16 h Estimate
Gentlest gradient and the only route with hut accommodation; same steep scree summit night via Gillman's Point (5,681 m). Wikipedia says it has the lowest success rate of the routes (claim marked as needing a citation).
Technical: loose scree on summit night
Gear: trekking boots, warm layers for summit night, trekking poles, headlamp
Permits: Kilimanjaro National Park entry with daily conservation, hut and rescue fees; licensed guide required.
Learn more: Wikipedia
Voie Lemosho
Technical 2/7
Effort 2/7 · Moderate est.
9 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
T3 (SAC hiking scale)
- Total gain
- 3,697 m
- Duration
- 9 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Voie Rongai
Technical 2/7
Effort 4/7 · Hard est.
5 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
T2 (SAC hiking scale)
- Total gain
- 3,900 m
- Duration
- 5 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Voie Machame
Technical 2/7
Effort 3/7 · Demanding est.
7 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
T3 (SAC hiking scale)
- Total gain
- 4,096 m
- Length
- 36.3 km
- Duration
- 7 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Voie "Coca-cola" Marangu (voie normale)
Technical 2/7
Effort 4/7 · Hard est.
6 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
T2 (SAC hiking scale)
- Total gain
- 4,096 m
- Length
- 33.4 km
- Duration
- 6 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Western Breach
Technical 4/7
Effort 4/7 · Hard est.
6 days on the mountain
⚠ Prior acclimatization required · ~0 days
Altitude Very high
PD- (IFAS (French alpine))
- Total gain
- 4,095 m
- Duration
- 6 days
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Voie Umbwe
Technical –/7
⚠ Prior acclimatization required · ~0 days
Altitude Very high
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.
Voie Mweka
Technical –/7
⚠ Prior acclimatization required · ~0 days
Altitude Very high
Route data: Camptocamp.org (CC BY-SA) — see the full description, topo and recent outings there.